

The Thurness Family Nutrition Center was added to bolster CSC athletics' strength and conditioning program in Fall of 2020. Contributions from Dr. Brent and Shelly Thurness of Rapid City, S.D., made the construction of the nutrition center possible.
The facility upgrade utilizes the space formerly housing a concession stand for Armstrong Gymnasium. It provides additional equipment and infrastructure which enhances its ability to store, prepare, and distribute nutritional products to CSC student-athletes.
Â
The granite countertop and brand new cabinetry were both sourced by Morford's Decorating in Chadron and installed by the CSC facilities staff.
Â
The facility is also equipped with an overhauled food sanitation system. This is comprised of refrigeration, plumbing, electrical wiring and food storage, which ensures compliance with safety standards.
Â
Additional equipment includes four Ninja blenders which are used for the preparation of protein smoothies.
Â
The contribution for the nutrition center not only funded the initial construction project, but it also provides ongoing support. This provides for supplements such as fruits, pre-made sandwiches, and chocolate milk protein.